The construction market in 2026 calls for a more careful approach to selecting tradespeople than the usual criteria alone. CAPEB reports that activity is being driven by air conditioning and ventilation, while masonry, joinery and metalwork, and interior design, decoration and plastering remain in decline. This imbalance between trades directly affects lead times, prices and contractor availability depending on the type of project.
Checking RGE certification and grant eligibility: the risk of an expired label
A tradesperson may display the RGE label even though it does not cover the specific type of work you need. RGE qualifications are issued by field (wall insulation, heat pump installation, ventilation, etc.) and have an expiry date. Before signing, we recommend checking the official directory to make sure the qualification matches the planned work exactly and is valid when the project begins.
This becomes critical when MaPrimeRénov’ rules change during the year. Eligibility criteria and the work covered may change, making an estimate prepared a few months earlier obsolete. Checking grant eligibility just before signing the quote, rather than at the planning stage, helps avoid discovering too late that a type of work is no longer subsidised or that the selected tradesperson no longer holds the required qualification.
For everything you need to know about your 2026 project, the same principle applies: cross-check the type of work, the company’s qualification and the grant conditions in force when you enter into the contract.

Cash-flow pressures facing construction tradespeople: warning signs without jumping to conclusions
The financial vulnerability of some small construction businesses is documented by CAPEB. Entire trades are experiencing a prolonged decline in activity, putting pressure on the cash flow of the most exposed businesses. It would be a mistake, however, to treat this sector-wide reality as proof that any particular tradesperson is in financial difficulty.
A few specific warning signs are worth watching for, without automatically disqualifying a business:
- The tradesperson requests a deposit of more than one-third of the total amount before any work begins, without a reason related to a specific order for materials.
- Interim invoices are not issued or do not reflect the actual progress of the work.
- The company refuses to put in writing a payment schedule tied to verifiable physical milestones (completion of the structural work, watertight stage, completion of finishing work).
A payment schedule tied to actual progress protects both parties. It helps secure the tradesperson’s cash flow while ensuring the client does not pay for work that has not been completed. This is not a sign of mistrust: it is standard practice for well-structured construction contracts.
Signed quote and contractual commitment: what the price doesn’t tell you
A signed quote constitutes a contract. The details it contains (precise description of the work, brands and references of materials, completion times, payment terms) are legally binding on both parties. A low price paired with vague descriptions can lead to a succession of additional charges.
Three technical points to check in every quote:
- The distinction between a deposit and earnest money: a deposit commits both parties definitively, while earnest money allows the client to withdraw and forfeit the amount, or the tradesperson to cancel and repay double.
- Explicit reference to the applicable standards (DTU, RT 2020 or RE 2020, depending on the type of work) and the insurance policies held, including the policy number and insurer’s name.
- How construction waste will be handled: whether removal is included or the client’s responsibility, and the estimated cost if applicable.
Comparing quotes only makes sense when the services described are identical. A price difference between two quotes may reflect differences in material quality, insulation thickness or finishing work—not necessarily an excessive markup.
Contracts signed at home: specific rules
When a quote is agreed at the client’s home following a sales solicitation, specific rules apply. A cooling-off period is available, and restrictions govern the collection of payments before that period expires (subject to exceptions). Ignoring these rules may invalidate the agreement or complicate any subsequent claim.

Selecting a tradesperson for each type of work: tailor your criteria to the project
The 2026 market context calls for assessing each trade separately rather than relying on a contractor’s overall reputation. A highly skilled joiner may be overbooked because their sector is under pressure, while a mason who is available immediately may be so because demand for masonry has fallen.
For each type of work on the project, checking three things is enough to narrow down your options effectively:
Documented experience with the specific type of work (photo references and contact details for former clients with comparable projects), valid professional insurance (public liability and ten-year structural warranty, with a certificate for the current year), and the ability to provide a schedule coordinated with other trades if the project involves several.
On an energy renovation project, we find that coordination between ventilation work (which is growing) and insulation work (which depends on the trade involved) remains the main sticking point. If a qualified ventilation contractor installs an MVHR system before the insulation is complete, it can create thermal bridges that no one will fix later without additional costs.
The success of a project in 2026 depends less on finding “the right tradesperson” than on bringing together the right verified skills, trade by trade, within a contractual framework that protects progress on the work. The quote remains the only legally enforceable document: every line matters.



